We have produced float balls for more than 18 years, providing magnetic float balls, level switch float balls, traps float balls, and other custom-made solutions. We offer more than 80 kinds of float balls to suit various customer requirements.
- Rigorous Testing: Every float ball undergoes three testing projects before shipment: 100-degree hot water testing, high-pressure testing for over 8 hours, and Helium mass spectrometer detection for final verification.
- Leak-Free Guarantee: Our strict testing protocols ensure 100% no leakage from our float balls.
- Fast Delivery: For normal sizes, we maintain large stocks and can deliver within 2-3 days.
- Customization Experts: Custom-made products normally take 25-30 days, including sample confirmation before final production.
| Name | Hollow Bracket Float Ball For Level Conroller Valve |
| Model | Bracket Float Ball |
| Size | Customized / 94*50 |
| Application | Level Control |
| Material | 304 / 316L Stainless Steel |
| Certificate | ISO9001, CQC, SGS, CNAS |
Frequently Asked Questions
Q1 How to receive a price quotation in the shortest time?
When you send us an enquiry, please make sure to include all details such as model number, product size, and order quantity. We will send you a quote with complete details promptly.
Q2 Are you a trade company or a manufacturer?
We are a manufacturer with more than 20 years of experience, and we offer factory-direct pricing.
Q3 Which payment terms can you accept?
We accept T/T, Western Union, and PayPal for your convenience.
Q4 How do you ensure the quality of the float balls?
We conduct three major tests: 100°C hot water testing, 8+ hours of high-pressure testing, and a final Helium mass spectrometer detection to ensure 100% no leakage.
Q5 What is the typical delivery time?
For standard sizes in stock, delivery is within 2-3 days. For customized orders, the process typically takes 25-30 days including sample confirmation.
Q6 Can you provide samples for custom orders?
Yes, for customized products, we offer samples to customers for confirmation before starting final mass production.